- Outside view
- Torpedo tunneling
- 1″ Copper
- Connection outside
- Connection outside
- Continious run inside
- Continious run inside
- Continious run inside
- Getting ready for new water meter
- Continious run inside
- Connection to the city
- Connection to the city
- Equipment
Another water service upgrade is completed in Brampton. All our installations meet plumbing and building codes of Ontario and every job is inspected by city’s inspector.
Call us at +1 647 861 7191 or contact us for a FREE consultation.